Energy Storage Las Casillas 1
Energy Storage Las Casillas 1
1.75MWh Installed Power
San Bartolomé de Tirajana, Gran Canaria Island, España
Location
The storage project to be promoted by Ecoener will be hybridized with the Las Casillas 1wind farm, already in operation.
This project is co-financed with "Next Generation-EU" funds, promoted by the Institute for Energy Diversification and Saving (IDAE).
1.75MWh Installed Power
2026Year of Start of Operation
1Batteries LFP of 3,99 MWhPower of the installation 1,75 MW