Storage La Caleta

Expanding the value of our assets: hybridizing and storing renewable energy.

2.25MWh Installed Power

San Bartolomé de Tirajana, Gran Canaria Island, España

Location

The storage project to be promoted by Ecoener will be hybridized with the La Caleta wind farm, already in operation.

This project is co-financed with "Next Generation-EU" funds, promoted by the Institute for Energy Diversification and Saving (IDAE).

2.25MWh Installed Power

2026Year of Start of Operation

1Batteries LFP for 5,13 MWhPower of the installation 2,25 MW